<div dir="ltr"><div dir="ltr"><div dir="ltr"><div>Buongiorno, </div><div><br></div><div>Ladies and Gentlemen, </div><div><br></div><div>Do you think Genoa has the potential to become a major peering point given the large number of high capcity cables landing there? That's how Marseille became a peering point. A large number of cables put their CLS equipment in the Marseille Interxion 1 and 2 buildings and soon those riding the cables started cross connecting. </div><div><br></div><div>Genoa cables include</div><div>1. 2Africa. 180 Tbps design capacity. </div><div>2. Blue-Raman. 218 Tbps design capacity. </div><div>3. Sipartech's Medloop. ???</div><div>4. Unitirreno. (At least 320 Tbps depending on the branch). </div><div><br></div><div>Let me know your thoughts on or off-list. </div><div><br></div><div>Regards, </div><div><br></div><div>Roderick. </div><div><br></div><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr">Roderick Beck<div>Network Capacity Sourcing - Broker</div><div>Mobile: 00-36-70-605-5144. </div><div>Landline: 1-908-452-8183</div><div>Email: <a href="mailto:roderick.beck@networksourcing.net" target="_blank">roderick.beck@networksourcing.net</a></div><div>Telegram: @RoderickBeck</div><div>Tallinn & Budapest.</div><div><br></div></div></div></div>
</div>
</div>